EMC
- ECSS-E-ST-20-07C Rev.2 test 5.4.9 power lead transients
- Over testing for added confidence
- Shielding effectiveness test
- Determining the highest clock frequency for FCC
- Emission plot requirements
- MIL-STD-1275, version F
- Frequency cut offs of fibre
- EN 61000-4-3 – sanity check
- EN 61000-3-12
- Reverb experts
- IEC 60533 emissions
- RE102 system check
- 18 GHz field probe isotropy
- Ferrite clamp use
- Radiated susceptibility DO160 Category L
- EN 301 489-17 performance criteria
- Conducted emissions on twin mains ports
- Pre and post conducted emissions tests in DEF STAN 59-411
- Calculating the Energy content of Mil Std 1275 Imported Spikes
- Def Stan 59-411 Transient Test Probe Positioning